NEPA and CEQA Environmental Oversight

Environmental documents and reports must be written to be understood by the layperson, agencies, and regulators. Navigating the mitigation measures included in environmental documentation requires a skilled team that understands the balance between environmental compliance and the need to deliver construction projects on time and on budget. The KeishEnv experts provide NEPA and CEQA oversight, including the mitigation measures in the plans, specifications, and estimate (PS&E) packages that are critical to the successful implementation of a mitigation plan.

NEPA/CEQA Compliance

Our expertise is understanding the NEPA (National Environmental Protection Agency) and CEQA mitigation measures included in the environmental documents and providing the required oversite during construction. A contractor needs to be informed succinctly in the contract documents of the relevant issues, handling requirements and protections needed, what quantities to include in bids, and how they will be paid. Keish staff are proficient in determining cost implications of environmental compliance for all stakeholders.


NEPA/CEQA Environmental Planning Services

Our environmental professionals can also prepare the following planning documents, technical reports and analysis:

  • Initial Studies and Scoping Documents
  • Categorical Exemptions
  • Water Quality Technical reports
  • Biological Assessments

Design Integration

The Keish team is experienced with construction management and implementation, overseeing public, low-bid projects on behalf of the client to ensure that environmental requirements are correctly written into project plans, specifications, and estimate packages for public works. The design documents must include temporary water pollution control BMPs, permanent erosion control measures, and permanent water quality treatment facilities to ensure compliance is readily achieved by contractors.


Keeping Public Projects on Track

Our services have been invaluable in keeping public projects on time and on budget. Our experience includes drafting boilerplate Environmental Coordination and Cooperation specifications for agencies and preparing Technical Specifications for Caltrans highway projects and for BART.

Our skills were key in developing the Environmental Requirements specification for the VTA’s BART Silicon Valley Phase 1 and Phase II projects, and we assisted with the preparation of the specifications for that Design-Build RFP. Our team communicates critical issues during the procurement process, so that change is managed from bid time through construction.


All Services
  • Environmental Mitigation Field Oversight
  • NEPA and CEQA documentation/ Technical Report Preparation
  • Design Integration of NEPA/CEQA requirements